Applications

The right technology, applied to the right asset.

CarbonFitt works with innovators and suppliers to integrate suitable mineral and environmental technologies into infrastructure without compromising the asset’s primary purpose.

Concrete and public-realm infrastructure concept
Concrete and public-realm concept - retained as a core CarbonFitt visual
01

Sports surfaces

Potential mineral and performance-infill applications designed to support cooler surfaces, responsible water use and carbon removal while retaining safe play.

02

Playgrounds & SafeFitt

Modular playground applications that can target lower surface heat, local repair and traceable material and maintenance records.

03

Roofs & terraces

Systems considered within suitable roof, terrace and podium build-ups, including water-management and heat-mitigation opportunities.

04

Transport infrastructure

Potential integration within transport and logistics assets where carbon, heat and water outcomes can be monitored within a controlled boundary.

05

Public realm

Hard landscaping and regeneration applications designed around cooler environments, water efficiency and clearly defined maintenance.

06

Industrial assets

Controlled opportunities where material flows, water use, operational conditions and environmental evidence can be documented.

Sports surfaces · PitchScore

A project passport for every pitch.

PitchScore is CarbonFitt’s proposed evidence framework for sports surfaces. It keeps carbon progress, surface performance, sustainability and evidence transparency separate so every conclusion can be traced to its source.

  • Materials, batches and installation recorded
  • Performance tests linked to the project
  • Carbon estimates separated from measured outcomes
  • Evidence status managed through BioTrack
PitchScore is a development framework, not a certification or verified carbon-removal claim. The methodology and test requirements must be independently reviewed.
Artificial sports surface with an integrated mineral layer
PitchScore sports-surface concept

Playgrounds & nurseries

Replace one module. Not the whole surface.

SafeFitt’s development pathway uses individually replaceable safety-surface modules above a controlled CarbonFitt mineral layer. The aim is faster local repair, lower disruption and a traceable record of each installed and replaced component.

  • Visible modular construction
  • Replaceable wear-surface units
  • Site-specific installation evidence
  • Maintenance history recorded through BioTrack
Concept application. Final build-up, safety performance and carbon outcomes remain subject to product specification, testing and independent review.
Modular SafeFitt playground surface above a CarbonFitt mineral layer
SafeFitt modular playground concept
Commercial roof terrace with a CarbonFitt mineral-system cutaway
Roof and terrace integration concept

Roofs & terraces

Environmental function beneath a finished asset.

CarbonFitt is exploring contained mineral systems within suitable terrace and podium build-ups, coordinated with the asset’s structural, waterproofing and drainage requirements.

  • Finished terrace remains fully functional
  • Material and batch quantities recorded
  • Drainage and waterproofing protected
  • Project evidence retained through BioTrack
Conceptual build-up only. Structural loading, fire, drainage, waterproofing, durability and carbon performance require project-specific engineering and independent review.

Transport & logistics

Carbon removal within operational infrastructure.

CarbonFitt is exploring contained mineral systems beneath suitable roads, depots and logistics hardstanding, where materials, installation and monitoring can be managed within a defined project boundary.

  • Operational surface remains in service
  • Road and drainage build-up recorded
  • Material quantities linked to the asset
  • Evidence and maintenance history retained
Conceptual build-up only. Pavement design, loading, drainage, durability, safety and environmental outcomes require project-specific engineering and independent review.
Transport depot hardstanding with a CarbonFitt mineral-system cutaway
Transport and logistics integration concept

Carbon, heat and water — one evidence pathway.

Each application needs its own specification, water baseline, temperature monitoring, carbon methodology and independent review route. One pilot result will not be treated as proof for every application.

Explore pilot projects →