An early calculation based on stated assumptions. It is not a measured outcome.
Start a conversation ↗Environmental claims policy
Evidence before claims.
CarbonFitt separates development targets, modelled results, measured observations and independently verified outcomes.
How project status is described
A result produced through a documented calculation or methodology, subject to its assumptions and limitations.
A recorded observation or test result. Measurement alone does not constitute independent verification.
The required project record has been assembled for human or independent review.
A suitably qualified external organisation has made a documented decision within a stated scope.
What CarbonFitt will not claim without evidence
- Certified, verified or approved outcomes without the named responsible organisation and scope.
- Carbon-credit eligibility or issuance before the relevant methodology and verification requirements are met.
- Application-wide performance based on one project, model or pilot.
- Permanent carbon removal without the required evidence, monitoring and independent conclusion.
Website information describes CarbonFitt’s development direction and is not a certificate, verification opinion, investment recommendation or guarantee of project performance.